Connect with us

Hi, what are you looking for?

DailyflyDailyfly

Local News

ONGOING STREET WORK ON SOUTHWAY AVENUE

Lewiston, ID- Released by the City of Lewiston

Street work on Southway Avenue will continue tomorrow, Friday, June 16, 2023. The work zone will span from Snake River Avenue to 8th Street, resulting in limited traffic access with only one lane available.

We kindly request your cooperation and utmost caution while traveling through this area. The safety of both motorists and our dedicated crews is our top priority.

Crews are removing washed-out rock and other debris from the flooding event that occurred last week.

To ensure a smooth and secure flow of traffic, please adhere to the following guidelines:

1. Pay close attention to posted signs and traffic control instructions.

2. Maintain a reduced speed and be prepared for possible delays.

3. Refrain from entering designated work zones for your safety and the safety of our crews.